Home > Products > Plastic Mould & Rubber Moulds > Pipe Fittings Moulds >
pvc ppr pe pph ppsu pipe fittings moulds high quality cheap price ISO standard
Detailed Product Description |
SERVICE&SUPPORT :
1 Product Feasibility analysis will be made as soon as customer launch the project.
2 Mould flowing analysis will be made if necessary.
3 3D or 2D drawing will be provided according to customer's requirement.
4 The fastest injection cycle time will be taken into consideration at the begining of designing and during mould testing.
5 Weekly mould schedule will be provided each week.
6 Strictly mould inspection will be done before mould delivery, including running the mould on injection machine continuously and QC Mould-disassembly inspection.
7 As we have good partners in some countries such as Spain, Russia, Canada, Brasil, so we can provide fastest technical support after mould delivery.
1.Why Choose Soyi Mould To Be Your Cooperative Partner ?
1
|
We always think customer first!
|
2
|
We have a professional work team, bring you 13+ years of mould experience!
|
3
|
We have our own mold tooling workshop and specialize in OEM/ODM service!
|
4
|
We can provide one-stop service!
|
5
|
We can save your time and money!
|
2.Our Mould details.
Factory Name
|
Soyi Mould.
|
Product Material
|
ABS/PP/PC/POM/PVC/PS/TPU/TPR/PE/HDPE etc.
|
Mould Steel
|
45#/P20/718H/2311/2344 etc.
|
Mould Standard
|
DME/HASCO etc.
|
Design Ability
|
Product Design/Mould Design/Mold Flow/Analysis of motion.
|
Machining Ability
|
CNC/EDM/Grinder Machine/Drilling Machine/Wire-electrode cutting.
|
Mould Runner
|
Hot Runner/Cold Runner.
|
Cavity Number
|
1*1/1*2/1*4/1+1/1+1+1 etc.
|
Surface Treatment
|
Nitride/Polishing/Texture/Logo Print/Painting/Chrome Plating.
|
Injection Machine
|
120T/250T/380T/480T/530T/800T/1000T/1300T/1600T.
|
Mould Life
|
300000-1000000 shots.
|
Supply Ability
|
More than 40 sets per month.
|
Delivery Time
|
35-55 days.
|
Packaging
|
Wooden case
|
3.How Can Customer Get The New Mould?
Code
|
Procedure
|
Description
|
1
|
Enquiry
|
Discuss on the drawing or the sample, then give the best solution.
|
2
|
Quotation
|
The best price according to the customer's requires.
|
3
|
Order
|
Comfirm the order and deposit.
|
4
|
Design
|
Mold design after the confirmation of our customers.
|
5
|
Machining
|
Started must be after the approval of design.
|
6
|
Test
|
Arrange mould test after completing.
|
7
|
Sample
|
Send samples and test report to our customers.
|
8
|
Approval
|
Sample approval or modify the mould until the sample approved.
|
9
|
Delivery
|
Packing the mould for shipment.
|
|
Send your message to this supplier |
|
|
Supplier Details
[China (Mainland))]
|
|
|